Switch Interconnection - Best practise
12 years 2 months ago #38141
by skylimit
"...you are never too old to learn" anon
Switch Interconnection - Best practise was created by skylimit
Hi all, I was just wondering if there's a best practise for interconnecting Cisco switches on a network. For instance, 10 floors in a building are to be networked, would it be good practise to just daisy chain the switches and then terminate it on the router?
Something like so:
switch1<-->switch2<-->switch3<-->switch4<-->switch5<-->switch6,etc<-->Router
thanks for your time
PS. client machines will be connected to the switches obvoiusly
Something like so:
switch1<-->switch2<-->switch3<-->switch4<-->switch5<-->switch6,etc<-->Router
thanks for your time
PS. client machines will be connected to the switches obvoiusly
"...you are never too old to learn" anon
12 years 1 month ago #38144
by ipradip
Replied by ipradip on topic Re: Switch Interconnection - Best practise
Connect uplink of every floor switch into one switch then connect that switch to router so that it would be for maintenance. If you have sufficient ports in switch then you can use etherchannel(channel group) for every uplink.
12 years 1 month ago #38156
by skylimit
"...you are never too old to learn" anon
Replied by skylimit on topic Re: Switch Interconnection - Best practise
many thanks for your reply. Is this similar to Cisco Hierarchical Model where you have a core, distribution and access? Any more contributions will be much appreciated. thanks
"...you are never too old to learn" anon
12 years 1 month ago #38171
by Chojin
CCNA / CCNP / CCNA - Security / CCIP / Prince2 / Checkpoint CCSA
Replied by Chojin on topic Re: Switch Interconnection - Best practise
Normally you would have a setup like this:
2x Core Switch (L3 switch... e.g. 6509, 3750)
Lets say 3750 (type:24 port switches)
Every floor would have a couple of switches..
For this example in total 3 floors, 4 switches a floor. making a 12 switches for connection for the PCs.
The 12 switches would all have a double connection towards the 3750's (prefered optic fibres, else just utp) Making a 24 connections towards the 3750.
The 2x 3750 could be stacked to make up 1 logical switch followed by every uplink being a etherchannel for double throughput.
The 3750 are configured with SVI's for routing, the floor-switches could be 2960's (just L2 switches).
2x Core Switch (L3 switch... e.g. 6509, 3750)
Lets say 3750 (type:24 port switches)
Every floor would have a couple of switches..
For this example in total 3 floors, 4 switches a floor. making a 12 switches for connection for the PCs.
The 12 switches would all have a double connection towards the 3750's (prefered optic fibres, else just utp) Making a 24 connections towards the 3750.
The 2x 3750 could be stacked to make up 1 logical switch followed by every uplink being a etherchannel for double throughput.
The 3750 are configured with SVI's for routing, the floor-switches could be 2960's (just L2 switches).